TSX-V: IFOSLinkedIn
OverviewVertically integrated phosphate fertilizer project
LocationPará, Brazil
Ownership(1)99.4%
StatusMaintaining option
Mineral Reserves(2)Under review
Measured and Indicated Mineral Resources(2)60.4Mt at an average 12.0% P2O5
Inferred Mineral Resources(2)26.6Mt at an average 5.6% P2O5
Mine life(2)Under review
ProductsSSP
Excess sulfuric acid
Annual production capacity500kt SSP
30kt excess sulfuric acid

(1) Non-controlling interests represented by preferred non-voting shares issued by Itafos in 2018 upon exercise of warrants held by creditors under the 2016 Brazilian restructuring proceedings.

(2) Technical information, including Mineral Reserves, Measured and Indicated Mineral Resources (including Mineral Reserves), Inferred Mineral Resources and mine life, is presented as of the date of the latest technical report.

 

 

Itafos’ latest technical reports are available under Itafos’ profile on SEDAR at www.sedar.com or by clicking the link below:

View Technical Report

© 2024 Itafos
All rights reserved.
Disclaimer

Subscribe to our Email List